Large-Scale Residential Subdivision with Multi-Stage Delivery and Cost-Saving Solutions in Chambers Flat.

Client
QM Properties
Location
Chambers Flat, QLD
Value
$X
Size
330 lot house estate
Timeline
2009 - 2025
Category
Residential Developments
Status
Completed
Contact us
Contact us
Arrow

Project Overview

The Chambers Green housing estate development, spanning 330 residential lots across 9 stages, encompasses substantial earthworks, complex civil infrastructure, and the construction of essential community facilities including a regional park. The development supported by 2 Develop Urban required strategic management of challenging ground conditions and implementation of extensive external works, including a regional stormwater basin, sewer pump station, and local water infrastructure network. 


Meeting both environmental and engineering challenges, the project required innovative solutions for managing a perched water table and coordinating complex infrastructure delivery. Through effective stakeholder management and technical expertise, the development has progressed significantly with Stage 7 and Stage 8 complete, and the final stage on track for completion in Q1 2025, all resulting in the establishment of a thriving new community in Chambers Flat. 

Challenges Faced

The project presented several significant technical andlogistical challenges: 


Complex Ground Conditions 

A perched water table created significant site complications, with a 1m deep sand layer sitting above impermeable clay. This geological formation required an innovative solution to deliver improved lot suitability. 
 

Infrastructure Gaps 

The site lacked essential services, necessitating: 

  • The delivering of a regional sewer pumpstation 
  • Installation of a 1.4km water main
  • Construction of trunk infrastructure to facilitate regional services
  • Complex coordination of trunk infrastructure

Regulatory Complexity 

The project required management of 11 concurrent approvals, complicated by the need to correct and re-document previous consultant work. This demanded extensive re-design and re-submission efforts. 

Our Approach

Planning & Design Phase

  • Conducted comprehensive site investigations to understand ground conditions 
  • Collaborated on the development of the innovative earthworks strategy 
  • Designed complex stormwater management solutions 
  • Coordinated multiple approval processes with authorities 
  • Performed detailed peer review of previous documentation, identifying $400,000+ in project savings 

Implementation & Construction Phase 

  • Executed strategic sand redistribution program across the site 
  • Managed concurrent construction of water and sewer infrastructure
  • Coordinated complex infrastructure installations with neighbouring developments 
  • Implemented quality control measures throughout construction 
  • Adapted construction program to accommodate weather challenges

Stakeholder & Project Control 

  • Maintained regular communication with client and regulatory authorities 
  • Coordinated with multiple contractors and consultants 
  • Implemented rigorous quality assurance processes 
  • Managed project documentation and compliance requirements 
  • Provided ongoing construction phase support and supervision 

Results Delivered

The project has delivered significant positive outcomes:

  • Stage 7 Completed
  • Stage 8 Completed
  • Stage 9 for completion Q1 2025 


Infrastructure Achievement

  • Successfully implemented complex water and sewer infrastructure
  • Delivered a well-received stormwater basin design
  • Created serviced lots that received positive feedback from builders 


Community Impact

The development has contributed to local housing infrastructure, creating a new thriving community while overcoming significant technical challenges. Despite weather-related obstacles over the past years, the project has demonstrated 2 Develop Urban's capability to deliver complex developments under challenging conditions, with total client satisfaction.

Testimonials

Client ReviewS

"Communication has been clear, timely, and easy throughout the project. The team has been professional and proactive in addressing questions and requirements, with project deliverables that were well structured and aligned with expectations. Collaboration was smooth, and we appreciated the organised approach to managing each stage of the work."

Nathan Belling
IHB One Pty Ltd

"2 Develop Urban identified significant cost savings through efficient engineering design (specifically infrastructure optimisation) and management of complex site ground conditions for our Chambers Green development. Their technical expertise and comprehensive project management proved invaluable throughout the project."

Scott Wacker
QM Properties